What happens on the MCS onboarding call (and how to prepare)
The move to the redeveloped MCS scheme starts with a 15-minute onboarding call. What MCS asks on it, who should be on it, and how to prepare.
The redeveloped MCS scheme doesn't require RECC or HIES, and BUS work no longer does either. When it's safe to cancel, and what replaces the code.
A RECC or HIES membership is a real line in the overheads: the annual fee and the admin of keeping the listing current. For years the justification was simple, because MCS required it. The redeveloped MCS scheme dropped that requirement, the Boiler Upgrade Scheme followed on 18 June 2026, and "can I cancel it?" stopped having one answer.
Here's the short version. If your certification body has moved you onto the redeveloped MCS scheme, consumer code membership isn't an MCS requirement, and since 18 June it isn't needed for BUS installations either. If you're still on the legacy scheme, it's still required until your transition completes. The deadline for every MCS certified business to be on the redeveloped scheme is 31 March 2027.
The decision is worth getting right in both directions. Cancel too early and you're operating outside your scheme's requirements. Keep paying too long and you're carrying a membership whose job the scheme now does itself.
The redeveloped scheme moves consumer protection inside MCS. The Customer Commitment sets out your obligations to customers, complaints are handled centrally by MCS rather than through the codes, and you hold an Installer Agreement directly with MCS. Our guide to the redeveloped MCS scheme covers the full set of changes.
What 18 June 2026 added was the grant side. DESNZ formally recognised the redeveloped scheme as a Code of Practice for BUS, and MCS announced that, effective immediately, businesses delivering BUS installations no longer need consumer code membership if they're certified to the redeveloped scheme (MCS). That's the government confirming the scheme's protections are enough for grant-funded heat pump work, rather than MCS simply asserting it.
This is where businesses are getting caught. Plenty are still certified under the legacy scheme while they wait for their transition slot.
If you're on the redeveloped scheme, code membership isn't required by MCS, and BUS work is covered by the June recognition. Before you cancel, check whether any other funding scheme, framework or contract you work under names a code as a condition.
If you're still on the legacy scheme, nothing has changed. Your certification body manages your move, and until it's complete the legacy requirements, including consumer code membership, still bind you. The June exemption doesn't help here, because it only applies to businesses certified to the redeveloped scheme. With the transition closing on 31 March 2027, that's a matter of months, and the checks you'll go through, from the onboarding call to the transition assessment, are set out in what the MCS transition assessment actually checks.
Cancelling a membership doesn't cancel the obligations. Here's where each one now sits.
Financial protection. This is the main replacement. Under the redeveloped scheme you give each domestic customer a written guarantee for the system's design and workmanship, plus an MCS approved financial protection product that you buy on their behalf. MCS's requirements for those products say cover runs from the day the customer signs the contract, through the installation, and for at least six years after certification. It pays for remediation of design or workmanship faults, and for another business to complete the job, if you cease to trade or refuse to do the work after the MCS complaints process. Price it into every job before you cancel.
Complaints. Under the codes, a customer complaint about your work went to RECC or HIES. Under the redeveloped scheme it goes to MCS. What that means for you is the same as it ever was: when a complaint arrives, someone will want to see what you quoted, what you installed and what you told the customer. A complaints log per job, with dates and copies, is the difference between a resolved complaint and an escalated one. The documentation pack your customer walks away with still matters too, and solar commissioning compliance runs through what should be in it.
Deposits and cancellation rights. The statutory rights never came from the code. The 14-day cancellation period comes from the Consumer Contracts Regulations, and your duties on the quality of the work come from the Consumer Rights Act 2015. Both apply whether you hold a membership or not. The codes added deposit rules on top. RECC, for example, says a deposit should be a reasonable percentage of the estimated cost, gives 15% as an example and says it shouldn't exceed 25% under any circumstances, caps the deposit and any further advance payment at 60% together, and requires all of it to be insured (RECC Consumer Code, section 6.3). Leave the code and those specific limits stop applying, but the Customer Commitment still requires any deposit to be reasonable, justified and part of an agreed payment schedule, and you have to tell the customer how it's protected. The rules on what you can take and what happens when a customer cancels are covered in deposits and cancellation rights, and the working-capital side is in our cash flow breakdown for solar businesses.
The mandate is gone, but the membership may still earn its keep, and it's worth a deliberate decision rather than a reflex.
None of that's a reason to keep paying for a requirement that no longer exists. It's a reason to make the cancellation a decision with a date, rather than a surprise on a customer call.
If step 3 is the one that worries you, that's the gap job management software is supposed to close: every job's documents, DNO applications and customer sign-offs kept together on the project rather than scattered across a shared drive. The MCS readiness checker shows where your setup stands against the redeveloped scheme, or book a demo to see how Payaca handles compliance for heat pump and solar install businesses.
See how Payaca helps clean tech installers save time and grow their business.
Book a demoWant more from Payaca in your Google results?

The move to the redeveloped MCS scheme starts with a 15-minute onboarding call. What MCS asks on it, who should be on it, and how to prepare.

Batteries have no permitted development class of their own. When a home battery needs planning permission, and what to capture at survey.

Your DNO is whoever owns the network at the property, not the energy supplier. How to look it up, and when you don't have to.